details about the service

Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works
Plastering works

Plastering works

It is considered one of the most important items in construction works, as all surfaces are leveled with cement mortar in preparation for painting works. -Before starting cement mortar works, the surfaces are first prepared in terms of installing plastering accessories -The metal mesh is installed between the concrete elements and the buildings to avoid cracks -The metal angles are installed in the columns and windows -All surfaces are sprayed with water in preparation for splashing works -The splashing process is started and it is ensured that it is rough and pointed and with a thickness of not less than half a centimeter. -We start the plastering process by tightening the axes for all the spaces and ensuring that the axes are straight and perpendicular in order to maintain the squareness of the spaces. -The focus is made for the walls and ceilings so that the distance between two foci does not exceed 2 meters. -The focus is fully weighed and it is ensured that it is received with the tool. -After finishing the beams and strings, we start the filling process. -After finishing, all surfaces are received with the tool. -Ensure the dimensions and squareness of all openings and windows. -After finishing, the treatment process is carried out by spraying with water twice a day, morning and evening.

Service Information

  • Category Interior finishing works